ISTech Support Forum
http://www.istechforum.com/YaBB.pl
Evo-ERP and DBA Classic >> Suggestions for Updates >> Routings changes in WO maint.
http://www.istechforum.com/YaBB.pl?num=1071846173

Message started by deburr on 12/19/03 at 07:02:53

Title: Routings changes in WO maint.
Post by deburr on 12/19/03 at 07:02:53

Is there, or can there be a way, to delete a routing and copy another routing on an existing work order in the work order maintenance program? Presently, if there was a mistake or change after converting the sales order, we must cancel the work order, edit the master routing, convert the sales order again, edit the dates etc... in the the new work order, then reprint the traveler. I would like to edit the existing work order by deleting the routings as I can do now, and then copy an existing set routing sequences to the existing work order without creating them manually (just as in copy routings in RO-A). I hope this doesn't sound too confusing.

Steve

Title: Re: Routings changes in WO maint.
Post by Karen Mason on 12/19/03 at 11:29:43

You can edit the master routing.  Then change the work order status from R or F to S.  Save.  Reopen WO and change status back to R (I presume).  The new routing will be on the work order.  

I think you can only do this if there are no transactions against the work order.

ISTech Support Forum » Powered by YaBB 2.1!
YaBB © 2000-2005. All Rights Reserved.