ISTech Support Forum
http://www.istechforum.com/YaBB.pl
Evo-ERP and DBA Classic >> Problem Reports - Repeatable >> Standard Cost and Make-From's
http://www.istechforum.com/YaBB.pl?num=1248894694

Message started by PaulG on 07/29/09 at 12:11:34

Title: Standard Cost and Make-From's
Post by PaulG on 07/29/09 at 12:11:34

When I roll up the standard cost on boms (type F) that contain make-froms (type M) it does not include the cost of material, just the cost of outside processing (for the type M parts). Average and last cost seem to be rolling up just fine. Does anyone know why DBA is responding this way?

This is how the bom looks for the type F (note the Qty is x2 and there is no cost of material):


Code:
 Parent Part Number: E300000             Sample Type F Part                  Type: F


  Level   Component          Qty Required  T      Setup       Material      Out Proc
..2         E200000           2.00000000  M        0.000000    0.000000      3.200000


This is how the bom looks for the type M part alone (it properly rolls up the entire cost):


Code:
 Parent Part Number: E200000          Test Encoder Assy              Type: M

   Level   Component          Qty Required  T      Setup       Material      Out Proc        
---------- --------------- ---------------- -  ------------- ------------- -------------
.1         E100000             1.00000000  R      0.000000     14.440000      0.000000
           Encoder, 400 Counts, Optical       Refer: ENC

           Components Totals                       0.000000     14.440000      0.000000

           Incremental Costs for Parent            0.000000      0.000000      1.600000

           *** TOTAL COSTS ***                     0.000000     14.440000      1.600000

           Total Standard Cost for Parent         16.040000


Finally here is how I would expect the type F bom to roll up:


Code:
 Parent Part Number: E300000             Sample Type F Part                  Type: F


  Level   Component          Qty Required  T      Setup       Material      Out Proc
..2        E200000              2.00000000  M      0.000000    28.880000      3.200000

Title: Re: Standard Cost and Make-From's
Post by PaulG on 07/30/09 at 14:32:06

Anyone? Do I need to clarify further?

ISTech Support Forum » Powered by YaBB 2.1!
YaBB © 2000-2005. All Rights Reserved.