ISTech Support Forum
http://www.istechforum.com/YaBB.pl Evo-ERP and DBA Classic >> Problem Reports - Repeatable >> BM-G Calc Issue http://www.istechforum.com/YaBB.pl?num=1258407511 Message started by gtladmin on 11/16/09 at 14:38:31 |
Title: BM-G Calc Issue Post by gtladmin on 11/16/09 at 14:38:31 When using BM-G to print a range of items, the report is adding the Out Proc costs together. Our product engineer and Walter do not think this is correct! What we are seeing: Run BM-G 3 times, once for three different parts: ILTXX-SLX-WXX-C, ILTXX-SLX-WXX-L, ILTXX-SLX-WXX-R Results For each part report: part ILTXX-SLX-WXX-C: Component Totals Setup Material Out Proc 0.000000 95.006971 15.000000 Incremental Costs for parent 0.000000 0.000000 19.000000 *** Total Costs *** 0.000000 95.006971 34.000000 Total Standard Cost for Parent 129.006971 Part LTXX-SLX-WXX-L: Component Totals Setup Material Out Proc 0.000000 58.527971 7.500000 Incremental Costs for parent 0.000000 0.000000 16.000000 *** Total Costs *** 0.000000 58.527971 23.500000 Total Standard Cost for Parent 82.027971 part ILTxx-SLX-WXX-M: Component Totals Setup Material Out Proc 0.000000 58.677971 7.500000 Incremental Costs for parent 0.000000 0.000000 16.000000 *** Total Costs *** 0.000000 58.677971 23.500000 Total Standard Cost for Parent 82.177971 Now instead of printing individually, select Item Range (in this case these are 3 related parts that are together in the inventory listing) ILTXX-SLX-WXX-C, ILTXX-SLX-WXX-L, ILTXX-SLX-WXX-R (so range is ILTXX-SLX-WXX-C - ILTXX-SLX-WXX--R) Leave rest as default Viewing report, page 2 of part ILTXX-SLX-WXX-C shows Component Totals Setup Material Out Proc 0.000000 95.006971 15.000000 Incremental Costs for parent 0.000000 0.000000 19.000000 *** Total Costs *** 0.000000 95.006971 34.000000 Total Standard Cost for Parent 129.006971 Page 4 (page 2 for part ILTXX-SLX-WXX-L Component Totals Setup Material Out Proc 0.000000 58.527971 7.500000 Incremental Costs for parent 0.000000 0.000000 35.000000 *** Total Costs *** 0.000000 58.527971 23.500000 Total Standard Cost for Parent 82.027971 Page 6 (page 2 for part ILTxx-SLX-WXX-M Component Totals Setup Material Out Proc 0.000000 58.677971 7.500000 Incremental Costs for parent 0.000000 0.000000 51.000000 *** Total Costs *** 0.000000 58.677971 23.500000 Total Standard Cost for Parent 82.177971 What's up? Thanks, Val |
Title: Re: BM-G Calc Issue Post by Lynn_Pantic on 11/17/09 at 18:18:23 I agree that would not be correct but I just checked in my test company and could not duplicate. I can have programming take a look and see if there is some set of circumstances that could cause that to happen. |
Title: Re: BM-G Calc Issue Post by gtladmin on 11/25/09 at 06:34:31 That would be great if you could do that, Lynn. It's a mystery to us! Let us know. Thanks Val |
ISTech Support Forum » Powered by YaBB 2.1! YaBB © 2000-2005. All Rights Reserved. |