Welcome, Guest. Please Login.
11/01/24 at 11:31:39
News:
Home Help Search Login


Pages: 1
Send Topic Print
Mass status change to WOs (Read 446 times)
jwalden
Browser
*




Posts: 15
Gender: male
Mass status change to WOs
10/25/04 at 11:03:58
 
Is there anyway to make a status change to multiple WOs?  
 
If not, I'd like to request a method of making status changes to multiple work orders with filtering on date, WO#,  and item number.  I'd like a prompt for previous status =?  new status =?.  That way we could change all the work orders for a given item that had been status "F" to "S" in one step and back to "F" again in a second run to pick up a revision update which changes the bill of material or routing information
Back to top
 
 

James Walden
High Voltage Power Systems, Inc
2542 Highlander Way
Carrollton, TX 75006
972-248-7691
Email WWW   IP Logged
aricon
Active Member
*****


Systems
Consulting-See
website for
products!

Posts: 1283
Gender: male
Re: Mass status change to WOs
Reply #1 - 10/25/04 at 11:51:50
 
You could do this with the ISTS Search and replace utility.
 
http://www.istechsupport.com/addonut.asp
 
Only $49.95.... Grin
Back to top
 
 

Sincerely,

Lorne Rogers
President
Aria Consulting & Implementers Ltd.
Phone: (780) 471-1430
Fax: (780) 471-4918
E-mail: lrogers@ariaconsulting.net
Email WWW   IP Logged
jwalden
Browser
*




Posts: 15
Gender: male
Re: Mass status change to WOs
Reply #2 - 10/25/04 at 12:07:06
 
I have the search and replace utility and love it (although I don't use it effectively).
Perhaps I should clarify:
   
It's not simply changing the status field in the WO table from one value to another that I need, it is the action of erasing the WO bom (and routing) and recreating by going from status F (or R) to S and back to F (or R) that I would like to do en masse.
 
I don't think changing the status using NZFNR would do that, would it?
Back to top
 
 

James Walden
High Voltage Power Systems, Inc
2542 Highlander Way
Carrollton, TX 75006
972-248-7691
Email WWW   IP Logged
aricon
Active Member
*****


Systems
Consulting-See
website for
products!

Posts: 1283
Gender: male
Re: Mass status change to WOs
Reply #3 - 10/25/04 at 14:04:33
 
No it wouldn't. And I would suggest you contact Lynn directly to get a custom program for this, as there would be VERY little call for this to be included in an ISTS package as it is not a widely held requirement. In fact, that is the 1st time I have ever heard of this sort of desire.
Back to top
 
 

Sincerely,

Lorne Rogers
President
Aria Consulting & Implementers Ltd.
Phone: (780) 471-1430
Fax: (780) 471-4918
E-mail: lrogers@ariaconsulting.net
Email WWW   IP Logged
Lynn_Pantic
Administrator
*****


evolution (n) -
gradual change to a
different form

Posts: 5681
Re: Mass status change to WOs
Reply #4 - 10/25/04 at 15:38:35
 
You are right, Jim, NZFNR will change the status but not strip and replace the Routing and BOM.  You could use it to also delete records from WOBOM and WOROUT if all the needed filters existed in those files to strip the old BOM and Routing but you would still need to reset the status individually.  It would need to be a special program.
Back to top
 
 

Lynn Pantic
IS Tech Support
lynn@istechsupport.com
Email   IP Logged
Pages: 1
Send Topic Print