Welcome, Guest. Please Login.
10/31/24 at 23:25:44
News:
Home Help Search Login


Pages: 1
Send Topic Print
Post dating of W/O's (Read 385 times)
Vman
Senior Member
****


If it ain't broke,
don't fix it

Posts: 460
Gender: male
Post dating of W/O's
09/28/07 at 08:36:45
 
Currently, you can close out a work order on a future date, which in turn effects your inventory value.  I would like to see at least a warning message if you try to do this.
Back to top
 
 

EVO-ERP 2022.2
Build 4/22/22
Actican Zen V14 SP2 Workgroup
Win7 64-bit and Win10 Pro
WWW   IP Logged
cathyh
Active Member
*****


I used to be
indecisive; now I'm
not so sure......

Posts: 1213
Gender: female
Re: Post dating of W/O's
Reply #1 - 09/28/07 at 09:40:27
 
I would also like to see this for entering labor.  There have been a number of times when month and day have been transposed, or worse the year entered incorrectly, by our data entry person, not caught, and posted.  Ugh!!
I guess if we go to bar code reading for labor entry that won't be a problem, but for now....
 
For that matter, whenever a future year is entered by mistake in any program, I would like for big alarms to go off!  The only way to catch it currently is that we have entries in "Future Transactions" in GL-O Post GL transactions, and we have been known to ignore these!
Back to top
 
 

Cathy Hamilton
Wing Inflatables, Inc.
EVO-ERP2008.1(20 users) w/IS Tech update 5/25/09 (as of 08/21/09)
Windows 2008 Server/client
Pervasive V10.1
Email WWW   IP Logged
kevind
Active Member
*****


I was more than
willing to
"pony up",
how b'out U?

Posts: 639
Gender: male
Re: Post dating of W/O's
Reply #2 - 09/28/07 at 11:28:59
 
I would like the system to warn if a date entered is in the future for any date field that is used for any kind of posting in all programs.  It would not be necessary to warn of a future date for any reports that only print and do not do any other processing.  Dates in the past (at least with GL) are already dealt with by utilizing the Closing Date.
Back to top
 
 

Kevin Damke
Spectronics Corporation
ISTECH 2004.1 7/26/13 SP1 - 20 user
Evo-ERP Build 7/25/13 T7 -7i R6 - 3 user
(Prev version was 2004.1 10/24/12)
(All Patches Installed as of 7/26/13)
Pervasive 2000i SP4 - Crystal Reports V10
Email WWW   IP Logged
Pages: 1
Send Topic Print