Enter Finished Product - Actual Cost anomaly (Read 630 times)
vswhipple
Browser
*




Posts: 28
Enter Finished Product - Actual Cost anomaly
11/06/07 at 11:43:39
 
In DBA Classic, WO-I, we select N when prompted to use Standard cost and we let the system compute actual cost.
 
- How is DBA computing the actual cost?  We've seen some very odd anomalies where the total actual cost divided by the quantity is not what DBA computes in the actual unit cost field.
 
- Is there any chance it could pull the estimated cost even if we select N to use standard cost?  
 
Thanks,
Vykie Whipple
Brey-Krause Mfg. Co.
Back to top
 
 
WWW   IP Logged
David Waldmann
Active Member
*****


Live to work, or
work to live?

Posts: 1924
Gender: male
Re: Enter Finished Product - Actual Cost anomaly
Reply #1 - 11/06/07 at 16:31:25
 
We have found problems if we are not entering the final quantity. If it's not the final quantity we always manually calculate the actual cost.
 
There was a substantial thread about this probably about a year ago. You could probably find it using the Search function.
 
Back to top
 
 

David N Waldmann
President
Vermont Hardwoods
Chester, VT

Evo-ERP, 5 user
IST Build: 3/4/19, patched 04/30/19
Pervasive v11.31
Server 2012 / Win10 x64
Crystal Reports v11
Email WWW   IP Logged
Lynn_Pantic
Administrator
*****


evolution (n) -
gradual change to a
different form

Posts: 5681
Re: Enter Finished Product - Actual Cost anomaly
Reply #2 - 11/06/07 at 18:47:05
 
Back to top
 
 

Lynn Pantic
IS Tech Support
lynn@istechsupport.com
Email   IP Logged
vswhipple
Browser
*




Posts: 28
Re: Enter Finished Product - Actual Cost anomaly
Reply #3 - 11/08/07 at 11:55:41
 
What happens if SD-B parameter "Use Std Cost in Ent Fin Prod" is set to Y, but the operator says N to using standard cost in WO-I?
Back to top
 
 
WWW   IP Logged
Lynn_Pantic
Administrator
*****


evolution (n) -
gradual change to a
different form

Posts: 5681
Re: Enter Finished Product - Actual Cost anomaly
Reply #4 - 11/12/07 at 15:55:20
 
Then the program will calculate a prorated cost based on the partial completion logic described in the FAQ
Back to top
 
 

Lynn Pantic
IS Tech Support
lynn@istechsupport.com
Email   IP Logged
vswhipple
Browser
*




Posts: 28
Re: Enter Finished Product - Actual Cost anomaly
Reply #5 - 11/12/07 at 15:57:43
 
So that could account for the crazy actual cost values we're getting, correct?
Back to top
 
 
WWW   IP Logged
Lynn_Pantic
Administrator
*****


evolution (n) -
gradual change to a
different form

Posts: 5681
Re: Enter Finished Product - Actual Cost anomaly
Reply #6 - 11/12/07 at 17:35:00
 
Absolutely.