maggie
Browser
I love YaBB 1G - SP1!
Posts: 36
|
We have just loaded the August 2008 ISTECH Update. After opening the ECO button in SO-A or PO-A, if a change needs to be made, it will not allow us to tab to the internal date field or the ECO number field. Is that intentional? I have a suggestion for a future update for the ECO button. Our company sells to an outline drawing. We manufacture to an assembly drawing. We list both drawings in our ISECO file for a particular part number. It would be nice if we could list box select (for that part number) the outline drawing on the sales order. We would still designate the manufacturing drawing as the default which would appear on the work order and the purchase order.
|